Big Shoota

Tag: 40K

  • Lots and Lots of Rokkits!!!

    I guess the grots were let loose tonight so we got a bunch of little stuff done tonight! I fumbled around in my head all day during work, trying to figure out how I was going to do the rokkets in the nose. I wanted them to kinda stair step, creating an angle that matched…

  • Snotling Steps!

    Putzin’ around with a few small things over the last few days. Built the front nose intake. The top/bottom plate and vertical posts/vanes are glued together but poster tacked into place to hold them until the glue dries. I did this so I can remove it from the main nose plate and have access to…

  • Working my tail off – Part 2

    I’m working my tail off here! I’ve now paneled up the entire tail wings. I created smaller plates using the original struts and wing panels as templates. Then I trimmed them a bit smaller and cut them into interesting shapes, sanded them a little and glued them in place. Here’s a support and the upper…

  • Working my tail off here!

    That also means…. updates! I wanted to get the vertical stabilizers done today and that meant doing some of the detailing/paneling on the rear wing section to accomplish this. Here’s how I put it together. I superglued the engines in place and sanded all the edges on the wing panels. Then I used H-Beams to…

  • Finalized Ork Bommer Tail

    Got some time tonight to  work on the blasta bommer. I knocked out the base shapes for the tail – this should clear up a couple of questions floating around. Badfangs suggestion about raising the tail engines up so they’re not directly in line with the front engines was a good one. I accomplished it…

  • Blasta Bommer Tail Work

    Got a little work done tonight – won’t look like much but it’s a bit further along than last night. Did the rolled portion of the wings leading edges. I sliced a styrene tube lengthwise and trimmed it to fit and glued it to the open edges. Then I went after the rear engine assembly.…

  • Full throttle to the engines!

    Spent an hour working on getting the wing/engine connector worked out. Nothing too complex really. Carefully drilled out a hole big enough to just fit the 1/2 PVC into in each engine housing. Cut some pvc and temporarily hot-glued it in place. I then used a snake of plumbers putty and sealed it up good.…

  • Ork Blasta Bommer Tripod Modification

    My tripod came in yesterday and got the chance to get it ready late last night. Here now, in excruciating. boring detail, is how I modified the tripod for my bommer. Here’s the original tripod, maybe $20 tops online (Amazon.com I think). It’s rated to hold up to 2 pounds but after getting it in…

  • Support and Lessons Learned

    Stopped off at the hardware store at lunch today and picked up some pvc and epoxy putty. I picked up 1×4-way connector, 1xT connector, a male/female threaded connector, a 2′ piece of pvc pipe (all in 1.2″ dia.) and two tubes of plumbers epoxy putty for around $12. Nice and cheap! I get home and…

  • Bommer Fusleage

    Spent some time today on the bommer. Got the interior ribbing done. Took a long time and was tedious work to make sure everything went together right the first time. Here are the templates/parts initially cut put. The ribs were made from the same templatw and I wasn’t too worried about them being absolutely, perfectly,…